Here you can see existing wire at the top and the new wire at the bottom.
Neatly stapled for the inspection.

I brought all the coax and network to the new door. I also brought the two new cables into the panel, wired the neutrals and inserted the new 2(15amp) breaker. The lights are on one circuit and the outlets are on the other.
Re-routing the existing wiring was a huge pain in the ass and I don't see any reason why I should have done it. I'm sure if I hired a professional they would have left it and done the minimum. To tell you the truth it put me behind my schedule.
I know I haven't been posting lately but wiring isn't existing and the progress pictures aren't very exciting.





No comments:
Post a Comment