Tuesday, November 25, 2008
I Passed the Framing Inspection
The building inspector called me back while I was sleeping and said he could drop by today at noon. I loved the fact that he called me back right away and the timing worked out pretty good because I was home sick.
He came in at noon with a trainee. She was the one filling out the paperwork (that I will scan and post later) and it only took a couple of minutes. She checked my work versus the design and the special notes from the permit. Most notably the size of my door (32") and the height of the soffit (I'm well above the 6' 5" required). She was also concerned about the R value of the insulation in between the joists (needs to be R20). I stated that it was existing insulation and hadn't changed it ... so that was fine. I asked a few of questions concerning insulation / vapour barrier:
Q: Can I go to the floor with the insulation or should I leave space?
A: They recommend I leave a space of at least 1' in case I have a flood. In that situation the insulation will wick the water upwards. And instead of replacing more drywall I would only have to replace the bottom bit.
Q: Do I need felt paper behind the insulation?
A: Yes. It keeps the insulation away from the exterior wall and helps keep it from falling.
Q: Staple vs Sealant to attach the vapour barrier.
A: Both are fine as long as I remember to make sure the vapour barrier goes in between the joists. I will try the acoustic sealant first and if that is too difficult to work with I will move to staples.
Q: How do I work to old insulation with the new stuff?
A: Overlap them at least 4" and tuck tape the seams.
Q: I would like to insulate the wall separating the laundry room and the rec room. What should I use to enclose to insulation.
A: Vapour barrier is fine.
Q: I'm planning on reusing the existing heating vent and how far down should I bring it.
A: You don't have to bring it to the floor but the fresh air intake should come to the floor.
He answered most of my questions while she filled out the paperwork. She showed me the notes and told me I passed. I said I should see them in a couple of weeks. I showed them out and went back to sleep... still not feeling well. The whole thing only took about 15 minutes.
Next step is electrical and venting. I'm slightly ahead of schedule because the inspection got done so quickly. I had 7 days allocated for inspection to give me a buffer for scheduling. Electrical (including coax and cat5) needs to be completed by December 5th for me to stay on schedule.
Framing done ready for inspection
Wednesday, November 19, 2008
Mistake number two
On Monday night I installed the pocket door. It seemed to go in pretty well unfortunately I didn't realize until it was in that I didn't have enough clearance for the soffit. This means all the work I did on Monday night had to be redone on Tuesday night. Even worse I had to take apart the pocket door frame and cut it down to fit.
Pocket door on Monday night:

Wednesday night I started on the soffit. It's not easy but I got most of it done. I built it on the ground then attached it to the joists.
I might even cover some of it with the plywood I bought to help secure it a little more.Having to redo the door but me behind schedule by one day. I'm still looking good though.
Sunday, November 16, 2008
All the walls are up


On Monday I hope to install the frame for the pocket door. I printed off some instructions from the manufacturers Web site and I should be good to go. Once I have that framed in I'll be able to figure out the soffit situation to see it I have enough clearance.
FYI the Bills are playing the Browns for the Monday nighter. Hopefully I'll get it done before kickoff.
Old framing meet new framing
I also realized that because of my previous mistake I had to buy one more PT stud. Below you can see the opening for my pocket door. You need to frame an opening 2 times the size of the door. I think it's going to be a nice feature but I'm concerned about clearance under the soffit that I'm going to build around the duct.
Wednesday, November 12, 2008
Two Walls Down and Two To Go

Monday, November 10, 2008
Intricate Corner Work

Enjoy it in all its wonderful splendor. I know it's just one wall but out the four walls I'm doing it's the second most intricate. Here's a pic of the difficult corner that I was talking about.

It doesn't look like much but when I get closer so you can see between the joists...

You can see the work. It's solid and fairly well framed. I probably used too many nails but I'm no expert at toe nailing.

I also did some of the tedious work of measuring and blocking the most difficult wall. This wall will need blocks all the way across, will need to go around pipes, will need to go around the ducts AND will need to be framed for a door.

Even though I have the day off tomorrow I'm not sure if I will have time to work on the basement. I have to clean my gutters, put up Xmas lights and head downtown to see the best live act around Priestess at Maverick's. I've seen them 7 times and I would consider myself a bit of a fan.
Sunday, November 9, 2008
My first mistake
When I started putting up the little wall in front of the drain I quickly realized that I should have put it on the outside of the two small side walls. There isn't anything to secure the ends of the top plates to and I can't put blocks in between the floor joist because of the drain. So I had to unscrew the bottom plate and cut a new piece. So my mistake may cost me $4.47 and about 1 1/2" of space. The wall will sit out 1 1/2" further that I had planned.
I think that was the only place I could make that mistake but it's not the end of the world. Let's hope I can learn from this and get more walls up efficiently.

It's really starting to look like walls.
Saturday's progress
Friday, November 7, 2008
My first problem
Thursday, November 6, 2008
Demo pics
I finished cleaning up the mess and started to chalk out the walls. I'm also trying to put together the electrical layout and start to work on the electrical permit.





Tonight I hope to get my first wall up.
Wednesday, November 5, 2008
Building Codes
Basement ceiling height
- 2 100 mm (6'11") over at least 75 per cent of the basement area except that under beams and ducts the clearance is permitted to be reduced to 1 950 mm (6'5")
Door minimums for basement
- width 810 mm (32")height 1 980 (6'6")
Windows
- By code aren't required in a basement with electric lighting
Smoke Alarms
- there is at least one smoke alarm on each floor level, including basements, that is 900 mm or more above or below an adjacent floor level
Bottom plates
- wood framing members that are not pressure-treated with a wood preservative and that are supported on concrete in contact with the ground or fill shall be separated from the concrete by not less than 0.05 mm polyethylene film or Type S roll roofing.
Nail lengths
- Floor joist to plate – toe nail Minimum Length of Nails, 82 mm (3 1/4") 2 nails
- Stud to wall plate (each end) toe nail Minimum Length of Nails, 62 mm (2 1/2") 4 nails or end nail Minimum Length of Nails, 82 mm (3 1/4") 2 nails
- Interior walls to framing or subflooring Minimum Length of Nails, 82 mm (3 1/4") Maximum Spacing of Nails, 600 mm (o.c.) (2')
Bracing and Lateral Support
- Bracing is not required where the walls are clad with panel-type siding, diagonally sheathed with lumber, or sheathed with plywood, OSB, waferboard, gypsum or fibreboard sheathing.
Lighting for Recreation rooms
- Minimum Illumination, lx 100
- Minimum Lighting Power Density, W/M2 of floor area (incandescent lighting) 10
I will be calculating my light using W/M2 (watts per square meter).
1 meter = 3.280 feet
10 watts / 3.280 feet
I have roughly 280 square feet and that means that I will need about 860 total watts in the room. My light are 50W so that means I'll need 18 lights total. I have originally priced out or 12 light and I will need to add another pack of 6 thus increasing my costs by $87.50 plus tax.
I'm not sure this will impact how many new switches I need on my electrical board but I'll figure that out later.
Tuesday, November 4, 2008
Demolition
As soon as the wall was down it changed the whole feeling in the basement. It opened it up but more important the flow was improved. I think Tracy and I are both looking forward to the end result now more than ever because we can feel the difference.
Ripping stuff down also revealed how poorly the house was built in the first place. Here's a short list:
- bottom plates aren't well fastened
- some top plates are split or weren't nailed properly
- drywall had nails in some spots and screws in other spots
I might have to redo some of the existing work particularly around the wall I removed. I might even have to redo some of the electrical work so it runs through the new walls. I guess the BI will let me know during the framing inspection.
I think that by the end of this week I will some some framed walls up. Although it supposed to be really nice weather for the next few days and I do have some other work I need to do outside (like raking up the leafs).
Monday, November 3, 2008
Time to get to work
He showed up exactly when he said he would and in a few minutes he had a skid of insulation placed in my garage and another skid of lumber and drywall in my driveway. I thought for a second he was going to try and put the lumber/drywall skid in my garage too but no so. He informed me that a standard garage opening is 7'10" and obviously my 8' long material wouldn't make it through. It didn't matter to me anyway because I was going to bring the lumber inside that day.
At 9am Tracy and I got started moving the building materials. By 10:30 we had moved 83 studs into the basement through the window, 9 bundles of insulation to the back of the garage and 19 sheets of drywall to the side of our garage. I also moved the pocked door frame and vapour barrier to the basement. I eyeballed every stud and made two piles... straight ones and wonky ones. I had to move all this stuff around because I want to park my car in the garage. It's getting closer to winter and I don't want to have to scrape my windows in the morning. Here's the pics:
Lumber, Pocket door, vapour barrier

Insulation

Drywall

My car just barely fits.
Later in the afternoon I picked up the remaining 8 pieces of pressure treated lumber and a box of Tapcons. FYI Tapcons are the special concrete screws that will be used to fasten the plates to the concrete slab. I bought a box of 100 screws and it comes with the drill bit to predrill the holes.
Side note on PT lumber
Apparently I don't necessarily need to use pressure treated (PT) lumber for the floor plates as long as I put some vapour barrier between regular lumber and concrete to protect the wood from moisture. The Home Depot guy also suggested these pink foam strips as an alternative. I thought about it but then realized that the cost of the pink stuff was a little higher than PT lumber. So my plan is to use vapour barrier underneath and PT lumber. It's a little more expensive but at least I know the bottom of our walls won't rot.
Sunday night after enjoying a relaxing day of watching football I started removing the old insulation. It was pretty easy and the bundles of remnant folded up nicely. I threw them in garbage bags in preparation for a curbside disposal. My plan is to put out an extra garbage can of home reno crap every week that way I wouldn't need to drive all the way out to the dump in Barrhaven.
I'm ready to demo the remaining wall and start layout out the plates. Now the real work begins, wish me luck.
FYI, I'm already late according to my own workplan... can you tell I work for the government. It's only one week and I should be able to make it up during the framing phase.