After my framing inspection I knew I would have to block out the bottom to keep my insulation in place and at least one foot off the floor. Luckily I kept all the scrap wood and I will have enough to block everything off. Hopefully I can get this done this week and get my inspection done before I head to Hamilton for Christmas. I'm a little behind schedule for a couple of reasons: first the electrical work was harder than I thought and second I took a few days off for my birthday and to do some Christmas shopping.



The insulation pics should be more exciting so I'll post them as I go.
No comments:
Post a Comment